Schedule One-Time Maintenance

The asset has a one-time maintenance record with a due date and visible status.

BeginnerAbout 4 minReviewed Nov 24, 2026

Create a dated maintenance task without setting a recurring schedule.

Before you start

1Open the asset detail

Choose Tools and select the tool that needs planned work.

Example tool detail header with a photo and location. The QR label is below the crop.

2Choose Schedule Maintenance

Enter the Work to perform description and select a Due date. Leave Make this schedule recurring unchecked for a one-time task.

The schedule form is unsaved. One-time maintenance is available on Free; creating a new recurring schedule requires active Starter or higher.

3Save and review

Select Schedule Maintenance. Review the scheduled task and due date on the asset detail page.

Synthetic example status. The crop excludes the QR label artwork and account profile.

Tips and notes

  • Tip: Free includes one-time scheduled maintenance.

Keep in mind

  • A due scheduled task can block checkout when maintenance becomes due. New due dates must be valid calendar dates and cannot be in the past.

When something looks wrong

Troubleshooting

Open the issue that matches what you are seeing, then work through the check before applying the fix.

The schedule cannot be saved.

Check: Confirm Work to perform is filled in and the due date is today or later.

Fix: Choose a valid date and submit again.

Still stuck? Contact OrbitEquip support.