Schedule One-Time Maintenance
The asset has a one-time maintenance record with a due date and visible status.
BeginnerAbout 4 minReviewed Nov 24, 2026
On this page
Create a dated maintenance task without setting a recurring schedule.
Before you start
- Role needed
- Owner or Admin. Ask an Owner if an action is unavailable.
- Plan needed
- This task is available on Free. Existing records may remain available after a downgrade; see the plan guide for details.
1Open the asset detail
Choose Tools and select the tool that needs planned work.
2Choose Schedule Maintenance
Enter the Work to perform description and select a Due date. Leave Make this schedule recurring unchecked for a one-time task.
3Save and review
Select Schedule Maintenance. Review the scheduled task and due date on the asset detail page.
Tips and notes
- Tip: Free includes one-time scheduled maintenance.
Keep in mind
- A due scheduled task can block checkout when maintenance becomes due. New due dates must be valid calendar dates and cannot be in the past.
When something looks wrong
Troubleshooting
Open the issue that matches what you are seeing, then work through the check before applying the fix.
The schedule cannot be saved.
Check: Confirm Work to perform is filled in and the due date is today or later.
Fix: Choose a valid date and submit again.
Still stuck? Contact OrbitEquip support.